To schedule a report, click on the Reports tab and select the report you want to run from the Type list on the left-hand side of the screen, as shown below:

If you want to change any of the report's parameters, refer to the relevant page in the list below:

When you have configured these parameters, click on the Schedule button, as shown below:

A new window will open, where you can set the scheduling parameters of the report: